The weekend turn
We start when you lock up on Friday. The floor is ground and repaired, then coated in two halves across Saturday and Sunday, and handed back for Monday opening.
Best for offices, retail, salons, clinics and single-shift shops.
Epoxy flake, quartz and metallic floor systems for warehouses, kitchens, shops and storefronts, installed in phases, overnight or over a weekend so your doors stay open. Most areas are back in service within about a day. Written 4–5 year warranty.
Pick how your business runs to see how we would phase the floor.
A commercial floor coating is a seamless, resin-based system bonded to a concrete slab to make it harder wearing, safer underfoot, easier to clean and better looking than bare or painted concrete. The concrete is diamond-ground, repaired and sealed with an epoxy base coat, built up with flake or quartz where grip and wear matter, and finished with a clear, chemical-resistant polyaspartic topcoat.
JDS Concrete Coatings installs commercial floor coatings across Northeast Ohio, including Canton, Massillon, North Canton, Jackson Township, Green and Akron, for warehouses, shop floors, commercial kitchens, retail, restrooms and animal-care facilities. Work is phased around your operating hours, and most areas return to service within about a day.
For most businesses the coating is not the expensive part. Lost hours are. So the schedule gets planned before anything else, and it gets planned around how you actually run.
We start when you lock up on Friday. The floor is ground and repaired, then coated in two halves across Saturday and Sunday, and handed back for Monday opening.
Best for offices, retail, salons, clinics and single-shift shops.
The floor is split into zones. We close one after you shut for the evening, coat it overnight, and move to the next. Customers and staff only ever see finished floor or untouched floor.
Best for restaurants, kitchens, breweries and seven-day retail.
In a building that runs around the clock, we coat alternating lanes so traffic always has a route. Once the first set is back in service, traffic moves over and we coat the rest.
Best for warehouses, distribution and multi-shift production floors.

Every building is different, so the real plan is drawn on your floor plan at the site walk. You get it in writing, with the dates and the times each area will be closed and reopened.
Different businesses break floors in different ways. Here is what each one is up against, and the system we would usually specify for it.

Pallet jacks, rolling racks and constant wheel traffic grind bare concrete into dust. A sealed floor stops the dusting, brightens the building and sweeps clean.
Usually: full-broadcast flake or quartz in traffic lanes

Dropped parts, coolant, cutting oil and heavy carts. The floor has to resist chemicals and impact, and it should not turn slick the moment something spills.
Usually: quartz

Grease, hot water and a nightly scrub. A seamless, non-porous floor with real grip gives grime nowhere to hide and staff somewhere safe to stand.
Usually: quartz, medium to aggressive texture

Floors that are hosed down every day, often with hot water and cleaning chemicals, and sloped to drains. Texture and chemical resistance come first.
Usually: quartz


Grout is where restrooms go wrong: it stains, it smells and it never looks clean again. A seamless coated floor removes the grout entirely.
Usually: quartz, smooth to medium texture

Offices, churches, schools, gyms, municipal buildings and multi-tenant properties all come up. If it is concrete and it is indoors, we can almost certainly coat it.
Swipe sideways to see every sector.
All three systems share the same diamond-ground prep, epoxy base coat and polyaspartic topcoat. Start from what the floor has to survive, and the choice usually makes itself.
| What the floor has to handle | Flake | Quartz | Metallic |
|---|---|---|---|
| Wet, greasy or hosed down daily | Good | Best | Avoid |
| Pallet jacks, carts and rolling loads | Good | Best | Avoid |
| Heavy daily foot traffic | Best | Best | Good |
| Customer-facing, has to look sharp | Best | Good | Best |
| Quick, easy mopping | Best | Good | Best |
| Hides dirt, scuffs and old slab repairs | Best | Best | Avoid |
| Large areas on a tight budget | Best | Good | Avoid |
Swipe sideways to see all three systems.
Whether you own the building, manage it, or are the general contractor on the job, here is what comes with a JDS commercial floor.
The jobs that go smoothly are the ones where both sides know their part in advance. This is ours, and this is yours.

What JDS doesMeasure the floor, check the slab for cracks, joints, moisture and old coatings, and ask how the space is used hour by hour.
What we need from youSomeone who knows the building and its schedule, and a floor plan if you have one.
What JDS doesSend a fixed written quote with the recommended system, the phasing plan and the closure times for each area.
What we need from youSign-off on the plan, and any landlord or general contractor requirements up front.

What JDS doesDiamond-grind the concrete with dust extraction, repair cracks, pits and joints, and apply the moisture-vapor-barrier epoxy base coat.
What we need from youThe zone cleared of stock, equipment and furniture before we arrive, and access at the agreed times.

What JDS doesBuild the system zone by zone: broadcast, scrape and topcoat. Each closed zone is barricaded and marked.
What we need from youStaff kept out of closed zones, and ventilation left running where we ask for it.

What JDS doesWalk the floor with you, confirm the return-to-service times for foot traffic and for equipment, and hand over the written warranty and care guidance.
What we need from youHold heavy loads off the floor until the time we give you. That patience is what protects the warranty.
Read what local customers say about working with JDS, then ask us at the site walk about recent floors near you that you can go and see.
Rated 5.0 by local customers on Google
JDS Concrete Coatings works out of Canal Fulton, right between the two counties. That puts us a short drive from the warehouses and light industrial buildings around the Akron-Canton Airport in Green, the retail of Belden Village and the Strip in Jackson Township, downtown Canton, Lincoln Way in Massillon, and the shops and plants on the south side of Akron.
Being close matters on a commercial job. Night and weekend phases mean a lot of trips, and a local crew can come back for a second phase, a punch list or a warranty question without it turning into an expedition.
Outside that list? Call (330) 575-5513. For larger commercial floors we travel further.
Often it does not have to close at all. JDS phases commercial floors around your hours: over a weekend, one zone per night, or lane by lane in a building that runs around the clock. Thanks to a fast-curing polyaspartic topcoat, most areas are back in service within about a day of being closed. You get the closure and reopening times for each area in writing before work starts.
For most warehouses the best choice is a full-broadcast epoxy flake or quartz system over diamond-ground concrete, finished with a polyaspartic topcoat. It stops the concrete dusting, stands up to pallet jacks and rolling loads, brightens the building and sweeps clean. Quartz is the better pick in the hardest-worked traffic lanes and anywhere the floor gets wet.
Yes. Night and weekend installs are a normal part of commercial work for us, and for many businesses they are the only way the job can happen. Tell us your operating hours at the site walk and the phasing plan is built around them.
A properly prepared, full-broadcast system is built for it. What makes a coating fail under wheel traffic is almost always poor surface prep or a thin, single-coat product. JDS diamond-grinds the slab so the base coat bonds to the concrete itself, then builds thickness with a full broadcast of flake or quartz. For the heaviest loads, quartz is the stronger system.
Yes, and it is one of the most common reasons businesses call us. Ohio's food safety code calls for floors that are smooth, durable, non-absorbent and easily cleanable. A sealed, seamless quartz floor is built to meet that description while still giving staff grip on a wet, greasy floor. Requirements vary by operation, so confirm the details with your local health department before work starts.
In most cases, yes. Old paint, sealers and failed coatings are removed by diamond grinding, and cracks, pits, spalls and worn joints are repaired before the base coat goes down. Floor tile and adhesive usually have to come up first. If the slab has a moisture problem or is structurally unsound, we will tell you at the site walk rather than coat over it.
Floor coatings do have some odor while they are being applied and while they cure, and how noticeable it is depends on the product and the ventilation. We plan the phasing and the ventilation with that in mind, and staff can normally work in other parts of the building. If you have sensitive stock, food or occupants, tell us at the site walk and ask for the product data sheets.
JDS Concrete Coatings is insured and bonded. A certificate of insurance is available on request, which landlords, property managers and general contractors normally ask for before work begins. Let us know early if your building has specific requirements.
It depends on the square footage, the condition of the slab, the system you need, and how the work has to be phased. Night, weekend and multi-phase schedules add trips, so they affect the figure too. Larger floors are generally more economical for their size than small ones. JDS measures and inspects the floor in person and gives you a fixed written quote. Site walks are free and there is no obligation.
A short visit is enough for us to measure, check the slab, understand your hours, and come back with a fixed quote and a phasing plan. It's free, and there's no obligation.
Office hours Mon–Sat, 7am–7pm